- Combined area threshold to be considered principal10 acresacre43,560 square feet — about the size of an American football field without the end zones.
Where multiple supplemental solar energy facilities are on adjoining properties, or are interconnected in any way, and the total area of combined facilities exceeds ten (10) acres, they will be considered a single principal solar energy facility.
- Maximum area as percentage of property10 pct
The aggregate area used for the installation and operation of a supplementary solar energy facility shall not exceed ten (10) percent of the property on which the facility is located.
- Maximum wattage for supplementary solar2 MW
Maximum wattage (for off-site distribution): Two (2) megawatts.