Other

  • Minimum aisle width 20 ft20 ft

    In no case shall aisle widths be less than twenty (20) feet.

  • Buffer from property line or road150 ft

    One hundred fifty (150) feet from any property line or road. No panels, cabinets, or other associated equipment, exclusive of utility poles, wires, cables, and access roads, shall be located closer than twenty-five (25) feet from the buffer.

  • Buffer from RPA wetlands, rivers, streams100 ft

    One hundred (100) feet from RPA wetlands, rivers, streams or other environmentally sensitive features and fifty (50) feet from any wetland not associated with an RPA. No panels, cabinets, or other associated equipment; exclusive of utility poles, wires, cables, and access roads, shall be located closer than ten (10) feet from the buffer.

  • Decommissioning plan required

    All applications for Solar facilities shall be accompanied by a comprehensive decommissioning plan, as required by the Hanover County Solar and Energy Storage Policy.

  • No building, structures, solar panel arrays or other equipment utilized on-site may exceed twenty (20) feet in height above finished grade. This restriction shall not apply to electric utility poles. Security fencing shall be limited to eight (8) feet in height.

  • Land disturbance activity shall be limited to no more than one hundred (100) acres at a time, unless a greater amount is permitted at the time of site plan review by the Director of Planning.

  • Landscaping standards for buffers

    Buffers shall be landscaped in accordance with the standards set forth in this subsection, depending upon the type and density of existing trees and shrubs.

  • Lighting requirements

    Where required, site lighting shall meet the requirements of Article 5, Division 6, Lighting Requirements of the Hanover County Zoning Ordinance with regard to off-site light trespass. All fixtures shall utilize full cut off shielding. Lighting shall be reduced during nighttime hours to the minimum level necessary to maintain safety.

  • Phasing plan required if phased

    Solar facility applications shall include a phasing plan if the project is to be phased.

  • Security fencing max 8 ft8 ft

    Maximum height for fencing shall be eight (8) feet. Fencing shall include wildlife friendly design features, where the Director of Planning deems them appropriate.

  • Utility scale facilities may be no greater than one thousand (1,000) acres.

  • Stormwater management not in buffer

    Stormwater management facilities shall not be located within the required buffer.

  • Tree protection plan required

    A tree protection plan certified by a Landscape Architect, Certified Horticulturist, or ISA Certified Arborist must be provided with the site plan.

  • Underground utilities required

    All new transmission and distribution lines shall be placed underground except for specified exceptions.

From the ordinance

Principal solar energy facilities must conform to the following standards.