Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum increased setbackSetbackThe distance a building must be held back from a lot line.800 ft
Increased setbacks up to 800 feet and additional buffering may be included in the conditions for a particular permit on a case by case basis.
- SetbackSetbackThe distance a building must be held back from a lot line. from main buildings on adjoining parcels150 ft
The project area shall be set back a distance of at least 150 feet from all public rights-of-way and main buildings on adjoining parcels, and a distance of at least 150 feet from adjacent property lines.
- SetbackSetbackThe distance a building must be held back from a lot line. from adjacent property lines150 ft
The project area shall be set back a distance of at least 150 feet from all public rights-of-way and main buildings on adjoining parcels, and a distance of at least 150 feet from adjacent property lines.
- SetbackSetbackThe distance a building must be held back from a lot line. from public rights-of-way150 ft
The project area shall be set back a distance of at least 150 feet from all public rights-of-way and main buildings on adjoining parcels, and a distance of at least 150 feet from adjacent property lines.
From the ordinance
The project area shall be set back a distance of at least 150 feet from all public rights-of-way and main buildings on adjoining parcels, and a distance of at least 150 feet from adjacent property lines.