Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Permit type for large scale solar
A conditional use permit is required for each large scale and community/shared solar energy facility proposed to be constructed, installed, or operated in the county.
- Permit type for small scale solar
A zoning permit is required for each small scale solar energy facility proposed to be constructed, installed, or operated in the county.
From the ordinance
A conditional use permit is required for each large scale and community/shared solar energy facility proposed to be constructed, installed, or operated in the county. A zoning permit is required for each small scale solar energy facility proposed to be constructed, installed, or operated in the county.