Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. activity damage threshold50 pct
exceed 50 percent of the cost of reconstructing the entire activity or structure
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. structure damage threshold75 pct
exceed 75 percent of the cost of reconstructing the entire structure
- Restoration completion period18 months
completed within 18 months
- Restoration start period12 months
started within 12 months
From the ordinance
If a nonconforming activity is destroyed or damaged in any manner to the extent that the cost of restoration to its condition before the occurrence shall exceed 50 percent of the cost of reconstructing the entire activity or structure, it shall be restored only if such use complies with the requirements of this chapter.