Greene County Unincorporated, Virginia · General provision
Definitions - Solar energy generation facilities
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum setbackSetbackThe distance a building must be held back from a lot line. for solar energy generation facilities300 ft
The project area shall be set back at least 300 feet from all abutting public rights-of-way and main buildings on adjoining parcels, and from adjacent property lines.
From the ordinance
The project area shall be set back at least 300 feet from all abutting public rights-of-way and main buildings on adjoining parcels, and from adjacent property lines.