- Solar vegetative buffer width300 ft
The buffer shall consist of a landscaping strip at least 300 feet wide, shall be located within the setbacks required, and shall circle the entire perimeter of the property.
- Decommissioning timeframe12 months
The project shall be deconstructed and removed within 12 months after the project sites are permanently decommissioned.
- Solar facility fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.6 ft
Such fencing shall enclose the project area at least six feet in height and be equipped with appropriate anticlimbing devices.
- Dark sky compliant lighting
Lighting on the site shall be dark sky compliant.
- Maximum solar panel heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.12 ft
Ground-mounted solar energy generation facilities shall not exceed a height of 12 feet, measured from the highest natural grade below each solar panel.
- Solar facility setbackSetbackThe distance a building must be held back from a lot line.300 ft
The project area shall be set back at least 300 feet from all abutting public rights-of-way and main buildings on adjoining parcels, and from adjacent property lines.
From the ordinance
Solar energy generation facilities ... This use is allowed by SUP as listed in specific districts and is subject to the following performance standards. ... The project area shall be set back at least 300 feet ... Ground-mounted solar energy generation facilities shall not exceed a height of 12 feet ...