Article 21
Dimensional standards
Height & bulk
- Minimum landscaping
- 4%
Extracted standards
41 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Design
- Advertising prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance.
No advertising of any type may be placed on the tower or accompanying facility. (21-2-3(4)e)
- Building code compliance
To ensure the structural integrity of towers, the owner of a tower shall ensure that it is maintained in compliance with standards contained in applicable federal, state and local building codes and regulations. (21-2-5)
- Collapse within lot lines
Towers shall be designed to collapse within the lot lines/lease area in case of structural failure. (21-2-3(4)g)
- Federal compliance
All towers must meet or exceed current standards and regulations of the FAA, the FCC, and any other agency of the federal government with the authority to regulate towers and antennas. (21-2-4)
- Lighting restriction
Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. (21-2-3(4)d)
- Maximum design heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. for co-location199 ft
the tower shall be designed and constructed to permit extensions to a maximum height of 199 feet. (21-2-3(4)f)
- Neutral color requirement
Towers shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA, be painted a neutral color (21-2-3(4)a)
Fencing & walls
- Minimum security fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.6 ft
Towers shall be enclosed by security fencing no less than six feet in height (21-2-10)
Landscaping & trees
- Minimum landscaped buffer width4 ft
The standard buffer shall consist of a landscaped strip at least four feet wide outside the perimeter of the facilities. (21-2-11(1))
- Tree protection distance200 ft
Existing trees within 200 feet of the tower shall not be removed (21-2-11(4))
Other
- Removal of abandoned towers
The owner of the tower or the property owner, as the case may be, shall remove the structure and all associated facilities within 90 days of receipt of the notice from the zoning administrator to do so. (21-2-13)
- Abandonment period24 months
Any telecommunication antenna structure or antenna not operated or used for a continuous period of 24 months shall be considered abandoned. (21-2-13)
- Amateur radio exemption
This ordinance shall not govern any tower or the installation of any antenna that is: 1) under 50 feet in height and is owned and operated by a federally-licensed amateur radio station operator, or 2) used exclusively for receive only antennas for amateur radio station operation. (21-2-2(2))
- Article control
Should any provision of this article conflict with another section of the Greene County Code of Ordinances, this article shall control. (21-2-2)
- Demonstration of no existing tower
No new tower shall be permitted unless the applicant demonstrates the reasonable satisfaction of the County of Greene that no existing tower or structure can accommodate the applicant's proposed antenna. (21-2-8)
- Co-location encouraged
Applicants for new tower construction permits are encouraged to allow additional permitted uses of the tower by future applicants (21-2-3(2))
- Co-location policy
The applicant shall provide copies of its co-location policy. (21-2-6(3))
- County facility public comment
Prior to issuing this determination, the board shall allow for public comment on the proposal for a period no shorter than 30 days. (21-2-14(b)(2))
- County facility public necessity
Prior to construction, the board shall issue a written determination of public necessity for the proposed telecommunication antenna structures and related facilities. (21-2-14(b)(2))
- County facility transfer
In the event the county desires to transfer its ownership of a telecommunication antenna structure to a private commercial entity, a special use permit (SUP) for the use shall be required pursuant to this article. (21-2-14(b)(4))
- County assumption of ownership
Alternatively, with consent of the owner, the county may assume ownership of the telecommunications antenna structure and any related facilities for its own use. (21-2-13)
- County removal
Should the owner fail to comply with the removal requirement notice, the county may remove the telecommunications antenna structure and any related facilities, the costs for which shall be paid by the property owner. (21-2-13)
- Compliance with districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. setbacksSetbackThe distance a building must be held back from a lot line.
Towers, guys, and accessory facilities must satisfy the minimum zoning district setback for primary structures. (21-2-9(2))
- Engineering report for co-location
An engineering report, certifying that the proposed tower is compatible for co-location must be submitted by the applicant. (21-2-6(1))
- Antenna addition to existing structure
The placement of an antenna on or in an existing structure such as a building, sign, light pole, water tank, or other free-standing structure or existing tower or pole shall be permitted so long as the addition of said antenna shall not add more than 20 feet in height to said structure or tower (21-2-2(3))
- Factors considered for SUP
Greene County shall consider the following factors in determining whether to issue a special use permit (21-2-7)
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. threshold for applicability50 ft
The requirements set forth in this ordinance shall govern the location of towers that exceed, and antennas that are installed at greater than 50 feet in height. (21-2-2(1))
- Inventory of existing sites
Each applicant for an antenna and/or tower is expected to provide to the County of Greene an inventory of its existing facilities that are either within the locality or within five miles of the border thereof (21-2-3(3))
- Draft lease
A draft copy of the lease for the subject property, if applicable. (21-2-6(4))
- Local government access
Owners of towers are encouraged to provide the county co-location opportunities as a community benefit (21-2-12)
- Minimum users for towers 100-199 ft3 users
Towers between 100 feet to 199 feet tall shall allow for a minimum of three users including the primary user. (21-2-6(1))
- Minimum users for towers under 100 ft2 users
Towers less than 100 feet tall shall allow for two users including the primary user. (21-2-6(1))
- Noncommercial residential antenna
Any noncommercial antennas and other similar devices for private, in-home residential use, such as broadcast television antennas, wireless access points/routers, wireless network range extenders, and the like. However, any such antenna or device shall be subject to the maximum height requirements of the underlying zoning district. (21-2-14(a)(5))
- Movement of nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. tower
Any nonconforming telecommunication antenna structure may be moved to another portion of the same property on which it is constructed upon approval of a special exception by the board. (21-2-15)
Any telecommunication antenna structure constructed prior to [August 11], 2020 which otherwise does not comply with the provisions of this article shall be deemed a lawful nonconformity. (21-2-15)
- Notification of adjoining property owners
The County of Greene shall notify adjoining property owners in accordance with Code of Virginia, § 15.2-2204. (21-2-6(2))
- Photographs of site
Photographs of the proposed site and of the point(s) of access to the state road network. (21-2-6(5))
- SetbackSetbackThe distance a building must be held back from a lot line. from off-site residential structures100 pct
The tower must be setback from any off-site residential structure by no less than 100 percent the maximum permissible height of the tower. (21-2-9(1))
The applicant shall obtain a special use permit from Greene County before erecting towers or antennas covered by this article. (21-2-7)
- Temporary special event antenna
Any temporary telecommunication antenna structures erected by a commercial entity to provide coverage of a special event. Such a facility shall be allowed for a maximum of 30 days, or removed within seven days after conclusion of the event, whichever occurs first. (21-2-14(a)(4))
- Temporary state emergency antenna
Any temporary telecommunication antenna structures erected by a governmental entity for the duration of a declared state of emergency, provided that the facility is removed within three months of the end of the state of emergency. (21-2-14(a)(3))
From the ordinance
The requirements set forth in this ordinance shall govern the location of towers that exceed, and antennas that are installed at greater than 50 feet in height.