Article 7, Section 7-5-2.1
Dimensional standards
Lot
Density
Height & bulk
Housing
- Two-family
- by_right
- Three-family
- by_right
- Four-plus family
- by_right
Uses
Permitted by right18
- single-family detached dwellings
- semi-attached dwellings
- duplex dwellings
- multi-family dwellings
- townhouse dwellings
- churches
- schools
- parks
- playgrounds
- community centers
- noncommercial recreational facilities
- uses allowed by right in B-1, B-2, B-3 districts
- public utilities
- accessory uses and structures
- uses permitted by right in SR Senior Residential District
- public facilities
- temporary events
- temporary family health care structures
Conditional / special use3
- uses allowed with special use permit in B-1, B-2, B-3 districts
- telecommunication antennas and towers
- uses permitted by special use permit in SR Senior Residential District
Accessory1
- accessory uses and structures clearly subordinate and incidental to permitted principal uses
Extracted standards
11 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Design
- Visual and acoustical privacy
Each development shall provide reasonable visual and acoustical privacy for dwelling units. Fences, insulation, walks, barriers and landscaping shall be used, as appropriate, for the protection and aesthetic enhancement of property and the privacy of its occupants, screening of objectionable views or uses and reduction of noise.
Other
- Assurance for common space
The board of supervisors may require adequate assurance, in a form and manner which it approves, that the common open space shown in the final development plan for a PUD will be provided and developed.
- Time limit for beginning construction1 year
If no construction has begun in the PUD within one year from the approval of the site plan and recording of documents, such approval shall lapse and be of no further effect. The zoning administrator, upon showing of good cause by the developer, may grant an extension of six months.
- Minimum tract area10 acresacre43,560 square feet — about the size of an American football field without the end zones.
A PUD must include at least ten acres of contiguous land.
- Open spaceOpen spaceLand a development must leave unbuilt, sometimes required to be usable or planted. maintenance plan
PUDs with provisions for common open space and private streets shall be approved subject to the submission of a legal instrument or instruments setting forth a plan or manner of permanent care and maintenance of such areas.
- Phased development
A phased or staged plan development may be allowed in a PUD District upon approval by the board of supervisors in accordance with the guidelines set out in section 7-11.
- Street design standard
If the streets are to be dedicated for public use, they shall conform to the VDOT road design standards. Private street and drives may be allowed along as they comply with VDOT design standards.
Parking
- Parking area drainage
All parking areas and off-street loading areas shall be graded and drained so as to dispose of all surface water without erosion, flooding and other inconveniences.
- Parking area paving
All streets and any off-street loading areas shall be paved and the design thereof approved by the board. All areas shall be marked so as to provide for orderly and safe loading, parking, and storage.
- Parking area screening
Parking areas shall be screened from adjacent structures, roads and traffic arteries with hedges/dense planting, earth berm, changes in grade or a wall.
Signage
- Sign standards
Signs shall conform to article 14.
From the ordinance
The density shall not exceed eight units per acre.
Parking requirements
{
"dwelling_unit": "1.5 spaces"
}