Goochland County Unincorporated, Virginia · General provision

Article 31, Sec. 15-500

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum supplementary solar facility area10 pct

    The cumulative area utilized for installation and operation of a supplementary solar energy facility is limited to ten percent of the property on which located, provided that where rooftops of buildings containing a permitted use are utilized, the facility area may be increased by the square footage of those buildings.

  • Combined solar facility area threshold for principal classification435,600 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.

    Where supplementary solar energy facilities are adjoining or interconnected, and total area of combined facilities exceed ten acres, they shall be considered a principal solar energy facility and subject to applicable regulation.

From the ordinance

Solar energy facility, supplementary. ... The cumulative area utilized for installation and operation of a supplementary solar energy facility is limited to ten percent of the property on which located...