Sec. 15-125
Extracted standards
9 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Zoning administrator action time30 days
The zoning administrator will act upon a complete development plan within 30 days of receipt.
- Development plan required for swine facilities
A development plan for all swine facilities is required
- Maximum time to place swine into service36 months
at least ⅕ of the swine are placed into service within 36 months of plan approval
- Minimum fraction of swine placed into service0.2 fraction
at least ⅕ of the swine are placed into service within 36 months of plan approval
- Notice of placing into service30 days
The operator must provide the zoning administrator written notice within 30 days of placing into service any structure on the approved development plan.
- State-approved nutrient management plan required
If a nutrient management plan is required by the state, then the swine facility cannot operate until it has a state-approved nutrient management plan.
Signage
- Maximum sign area4 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
display at its entrance a sign, between two and four square feet
- Minimum sign area2 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
display at its entrance a sign, between two and four square feet
- Required sign text
stating that a development plan is in effect for the parcel and containing the words "certified agricultural development site."
From the ordinance
The development plan will be valid only if the proposed structures are constructed in accordance with it and only if at least ⅕ of the swine are placed into service within 36 months of plan approval.