Gloucester County Unincorporated, Virginia · General provision
Sec. 34-156
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Collector road base minimum thickness6 in
Six inches minimum of compacted limerock
- Collector road subgrade stabilization minimum depth12 in
stabilized subgrade must be a minimum of 12 inches in depth
- Collector road surface course minimum thickness1 in
One inch minimum D.O.T. type II asphaltic concrete
- Local road base minimum thickness6 in
Six inches minimum of compacted limerock
- Local road subgrade stabilization minimum depth8 in
stabilized subgrade must be a minimum of eight inches in depth
- Local road surface course minimum thickness1.25 in
1¼ inches minimum D.O.T. type I or type II asphaltic concrete
From the ordinance
Surface course (optional): 1¼ inches minimum D.O.T. type I or type II asphaltic concrete... Base: Six inches minimum of compacted limerock... Subgrade stabilization: ... minimum of eight inches in depth.