Frederick County Unincorporated, Virginia · General provision

§ 165-203.08

Dimensional standards

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • This section shall apply to all development activities that disturb more than 2,500 square feet of land, except for agricultural activities.

  • 10-year storm event control

    Stormwater management facilities shall be designed to control the peak rate of runoff from the development to the pre-development level for the 2-year, 10-year, and 25-year storm events.

  • 25-year storm event control

    Stormwater management facilities shall be designed to control the peak rate of runoff from the development to the pre-development level for the 2-year, 10-year, and 25-year storm events.

  • 2-year storm event control

    Stormwater management facilities shall be designed to control the peak rate of runoff from the development to the pre-development level for the 2-year, 10-year, and 25-year storm events.

  • On-site stormwater management required

    Stormwater shall be managed on-site to the maximum extent practicable.

  • Water quality volume (1-inch storm)1 inch

    Stormwater management facilities shall be designed to treat the water quality volume from the development, which shall be the volume of runoff from the 1-inch storm event.

From the ordinance

This section shall apply to all development activities that disturb more than 2,500 square feet of land, except for agricultural activities. Stormwater shall be managed on-site to the maximum extent practicable.
§ 165-203.08