§ 165-203.08
Dimensional standards
Servicing
- Geographic extent
- All development activities that disturb more than 2,500 square feetsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000. of land, except for agriculturalAgricultureRaising crops or livestock, generally including the structures that serve them. activities
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum disturbance threshold2,500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
This section shall apply to all development activities that disturb more than 2,500 square feet of land, except for agricultural activities.
- 10-year storm event control
Stormwater management facilities shall be designed to control the peak rate of runoff from the development to the pre-development level for the 2-year, 10-year, and 25-year storm events.
- 25-year storm event control
Stormwater management facilities shall be designed to control the peak rate of runoff from the development to the pre-development level for the 2-year, 10-year, and 25-year storm events.
- 2-year storm event control
Stormwater management facilities shall be designed to control the peak rate of runoff from the development to the pre-development level for the 2-year, 10-year, and 25-year storm events.
- On-site stormwater management required
Stormwater shall be managed on-site to the maximum extent practicable.
- Water quality volume (1-inch storm)1 inch
Stormwater management facilities shall be designed to treat the water quality volume from the development, which shall be the volume of runoff from the 1-inch storm event.
From the ordinance
This section shall apply to all development activities that disturb more than 2,500 square feet of land, except for agricultural activities. Stormwater shall be managed on-site to the maximum extent practicable.