Frederick County Unincorporated, Virginia · General provision
§ 165-201.12
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum sound level at property line in B3, TM, M1, M270 dba
In the B3 Industrial Transition, TM Technology-Manufacturing Park, M1 Light Industrial or M2 Industrial General Zoning District, sound levels at the property line of a development shall not exceed 70 dba (A scale).
- Maximum vibration peak particle velocity0.05 in/s
In no case shall vibrations exceed a maximum peak particle velocity of 0.05 inch per second.
From the ordinance
In no case shall vibrations exceed a maximum peak particle velocity of 0.05 inch per second. ... sound levels at the property line of a development shall not exceed 70 dba (A scale).