Frederick County Unincorporated, Virginia · General provision
§ 165-201.03B(9)
Dimensional standards
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
In the B3 (Industrial Transition) Zoning District, uses may exceed the height limitation so long as all front, side and rear setbacks conform to the setback requirements for the M1 (Light Industrial) Zoning District. In no case shall any structure in the B3 Zoning District exceed 45 feet in height.
From the ordinance
In the B3 (Industrial Transition) Zoning District, uses may exceed the height limitation so long as all front, side and rear setbacks conform to the setback requirements for the M1 (Light Industrial) Zoning District. In no case shall any structure in the B3 Zoning District exceed 45 feet in height.