1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Minimum capacity for utility scale solar2 MW
producing two MW or more of electricity
From the ordinance
Solar generation facility, utility scale: A solar energy conversion system producing two MW or more of electricity to a utility provider. Such facilities interconnect with an existing electrical grid serving other off-site facilities which are not adjacent or under common use, ownership or control.