Dayton, Virginia · General provision

Sec. 30-857(1)b

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Signage

  • Maximum temporary sign display period (building permit)24 months

    For signs authorized by section 30-851, the time a lot has an active building permit, only while the permit is active (up to a maximum of 24 months).

From the ordinance

For signs authorized by section 30-851, the time a lot has an active building permit, only while the permit is active (up to a maximum of 24 months).
Sec. 30-857(1)b