Chesapeake, Virginia · General provision

§ 13-1503

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Grass and weeds shall be maintained at a height not exceeding six (6) inches.

  • Maximum permit duration18 months

    Such permit shall be valid for a period not exceeding eighteen (18) months

  • Renewal period12 months

    A permit may be renewed for additional twelve-month periods

  • Restoration period after expiration60 days

    The yard shall be closed and all buildings... completely removed and the area properly seeded or otherwise restored with appropriate vegetation within sixty (60) days

From the ordinance

A temporary permit may be issued in all zoning districts... valid for a period not exceeding eighteen (18) months... renewed for additional twelve-month periods... restoration within sixty (60) days.
§ 13-1503