Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Signs erected at least 14 days before hearing14 days
All signs required under this subsection shall be erected not less than fourteen (14) days prior to the date of the first scheduled public hearing before the planning commission.
- Sign posting frequency for properties 1 acreacre43,560 square feet — about the size of an American football field without the end zones. or more500 ft
Properties that are one (1) acre or more in size shall post a sign at every five hundred (500) feet of road frontage.
From the ordinance
Properties that are one (1) acre or more in size shall post a sign at every five hundred (500) feet of road frontage. All signs required under this subsection shall be erected not less than fourteen (14) days prior to the date of the first scheduled public hearing before the planning commission.