Article 9, Subdivision Regulations
Extracted standards
17 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- 100-year floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. consideration
If any portion of the proposed subdivision is determined by the agent to be in the 100 year floodplain, the subdivider shall provide the necessary information to demonstrate that the presence of the 100 year floodplain was considered in the layout of the subdivision.
Other
- Advertising water/sewage disclosure
A subdivider, when advertising a subdivided tract of land for sale, shall be specific as to whether or not officially approved water and sewage facilities are available.
- Boundary survey closure accuracy5,000 ratio
A boundary survey with an error of closure within the limit of one in 5,000 related to the true meridian.
- Engineer certification for flood control
The flood control and drainage information shall include a properly certified engineer's statement that such improvements, when properly installed will be adequate to meet the criteria as applied to the proposed development.
- Erosion and sediment control plan
At the time of filing the preliminary plat, erosion and sedimentation control plan will also be filed in accordance with the City of Buena Vista Erosion and Sediment Control Ordinance and the provisions of the Virginia Erosion and Sediment Control Handbook.
- Final plat action time60 days
The city council shall act on proposed final plats within 60 days after it has been officially submitted for approval by either approving or disapproving such plat in writing.
- Final plat recordation time6 months
The subdivider shall have not more than six months after receiving final approval to file the subdivision plat for recordation.
- Fire hydrant requirement
The installation of adequate fire hydrants in a subdivision at approved locations are required, provided that the necessary water supply is available.
- Land-disturbing activity threshold10,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The Code of Virginia includes the term subdivision development along with activities disturbing 10,000 or more square feet of land for commercial or noncommercial uses.
- Performance bond for improvements
The subdivider shall furnish a certified check, letter of credit, cash escrow or contract for construction in the amount of the estimated costs of construction or a personal, corporate or property bond, with surety satisfactory to the governing body.
- Preliminary plat review time45 days
The subdivider shall then be advised in writing within forty five (45) days, which may be by formal letter or by legible markings on his copy of the preliminary plat, concerning any additional data that may be required.
- Preliminary plat validity6 months
The subdivider shall have not more than six months after receiving official notification concerning the preliminary plat to file with the administrator a final subdivision plat.
- Public water and/or sewer extension
Where public water and/or sewer is available, the service shall be extended to all lots within a subdivision by the developer.
- Septic tank approval
The governing body shall not approve any subdivision where sanitary sewers are not provided unless it shall receive in writing from the health department, a statement to the effect that the area contained in the subdivision is generally satisfactory for the installation of septic tanks.
- Stormwater management criteria
The subdivider shall also provide the plans for meeting the statewide stormwater management criteria, or alternate criteria adopted by the Buena Vista City Council.
- Utility easement width10 ft
Easements of not less than ten feet in width shall be provided for water, sewer, power lines, and other utilities to serve the subdivision when required.
- Utility plans approval
Plans and specifications for utility fixtures and systems to be submitted for approval. The governing body shall have 60 days in which to approve or disapprove the same.
From the ordinance
Subdivision regulations covering utility requirements, erosion control, plat approval, and design standards.