Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Floodplain
- FloodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions. consideration
If any portion of the proposed subdivision is determined by the agent to be in the 100 year floodplain, the subdivider shall provide the necessary information to demonstrate that the presence of the 100 year floodplain was considered in the layout of the subdivision.
From the ordinance
If any portion of the proposed subdivision is determined by the agent to be in the 100 year floodplain, the subdivider shall provide the necessary information to demonstrate that the presence of the 100 year floodplain was considered in the layout of the subdivision.