Appomattox County Unincorporated, Virginia · General provision

Definitions

Extracted standards

8 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Floodplain

  • Flood hazard area definition

    FLOOD HAZARD AREAS — The maximum area of the floodplain which is likely to be flooded once every 100 years or for which mudslides can be reasonably anticipated.

  • Floodproofing definition

    FLOODPROOFING — A combination of structural provisions, changes or adjustments to properties and structures subject to flooding required for new construction in the floodway by the County Building Code.

  • Floodway definition

    FLOODWAY — The channel of a river or other watercourse and the adjacent land area that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

  • Freeboard definition

    FREEBOARD — A factor of safety usually expressed in feet above a flood level for purposes of floodplain management.

  • Lowest floor definition

    LOWEST FLOOR — The lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided, that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of Federal Code 44 CFR 60.3.

  • New construction definition

    NEW CONSTRUCTION — For floodplain management purposes, structures for which the start of construction commenced on or after the effective date of a floodplain management regulation adopted by a community and includes any subsequent improvements to such structures.

  • Post-FIRM structure definition

    POST-FIRM STRUCTURES — For floodplain management purposes, a structure which construction or other development for which the "start of construction" occurred on or after the effective date of the initial Flood Insurance Rate Map.

  • Pre-FIRM structure definition

    PRE-FIRM STRUCTURES — For floodplain management purposes, a structure for which construction or other development for which the "start of construction" occurred before the effective date of the initial Flood Insurance Rate Map.

From the ordinance

FLOOD HAZARD AREAS — The maximum area of the floodplain which is likely to be flooded once every 100 years or for which mudslides can be reasonably anticipated.