§ 19.6-31, § 19.6-32, § 19.6-34, § 19.6-34.1, § 19.6-34.2
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Building permit required
No building permit shall be issued without written confirmation from the Zoning Administrator that all zoning requirements have been met and that all County codes have been met (i.e., a zoning permit).
- Additional civil penalty500 dollars
civil penalty of $500 for each additional summons or ticket arising from the same set of operative facts
- Initial civil penalty200 dollars
civil penalty of $200 for the initial summons or ticket
- Maximum criminal fine1,000 dollars
fine of not more than $1,000
- Minimum criminal fine10 dollars
fine of not less than $10
- Maximum aggregate civil penalty5,000 dollars
civil penalties which exceed a total of $5,000
- Zoning permit required
Land may not be used or occupied in violation of this article. Applications for a zoning permit shall be accompanied by two copies of a scale drawing showing the size and shape of the parcel, the nature of the proposed use, and the location of the building with respect to property lines and right-of-way.
From the ordinance
No building permit shall be issued without written confirmation from the Zoning Administrator that all zoning requirements have been met... Land may not be used or occupied in violation of this article... civil penalty of $200 for the initial summons or ticket, and $500 for each additional... misdemeanor offenses punishable by a fine of not less than $10 nor more than $1,000.