Albemarle County Unincorporated, Virginia · General provision

Sec. 5.1.57

Uses

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Farm brewery events, weddings, wedding receptions, and other events are permitted by right at a farm brewery provided that not more than 200 persons are in attendance at the farm brewery at any time

  • Maximum sound level

    Sound generated by outdoor amplified music shall not exceed the applicable maximum sound levels in section 4.18.04.

  • Sound generated by outdoor amplified music is prohibited between 10:00 p.m. each Sunday through Thursday night and 7:00 a.m. the following morning, and between 11:00 p.m. each Friday and Saturday night and 7:00 a.m. the following morning.

  • Zoning clearance required for events under certain conditions

    For each farm brewery licensed on and after December 9, 2015, the owner shall obtain a zoning clearance under section 31.5 prior to holding any events if either the lot or the abutting lots on which the events allowed in this subsection occur is less than 21 acres in size or the use will generate more than 50 visitor vehicle trips per day

From the ordinance

The following operational uses, events and activities are permitted at a farm brewery: ... Farm brewery events, weddings, wedding receptions, and other events are permitted by right or by special use permit... Sound generated by outdoor amplified music shall be subject to...
Sec. 5.1.57