Albemarle County Unincorporated, Virginia · General provision
Sec. 5.8
Dimensional standards
Servicing
- Geographic extent
- Applies to temporary industrialized buildings used for additional space for employees, students, etc.
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Site plan approval required
Before a building permit is issued for the temporary industrial building, the owner shall obtain approval of a site plan.
- Skirting installation deadline after certificate of occupancy60 days
Skirting shall be provided from the ground level to the base of the temporary industrialized building within 60 days after the certificate of occupancy is issued.
From the ordinance
A temporary industrialized building may be authorized by a zoning clearance ... Skirting shall be provided from the ground level to the base of the temporary industrialized building within 60 days after the certificate of occupancy is issued.