Albemarle County Unincorporated, Virginia · General provision
Sec. 5.7
Dimensional standards
Servicing
- Geographic extent
- Applies to temporary manufactured homesManufactured homeA dwelling built in a factory to a federal standard and transported to the site. used as interim housing during construction
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Removal of temporary manufactured homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. after certificate of occupancy30 days
The manufactured home shall be removed within 30 days after issuance of a certificate of occupancy for the permanent dwelling.
- SetbacksSetbackThe distance a building must be held back from a lot line. determined by Zoning Administrator
Minimum frontage setback and side and rear yard setbacks shall be determined by the Zoning Administrator.
- Potable water and sewerage required
Provision of potable water supply and sewerage facilities to the reasonable satisfaction of the Virginia Department of Health.
From the ordinance
The manufactured home shall be removed within 30 days after issuance of a certificate of occupancy for the permanent dwelling. Setbacks determined by Zoning Administrator. Water supply and sewerage to satisfaction of Virginia Department of Health.