Albemarle County Unincorporated, Virginia · General provision
Sec. 5.1.26
Dimensional standards
Lot
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Lighting
- Outdoor lighting
The hydroelectric power generation facility shall comply with the requirements of section 4.17 regarding outdoor lighting.
Noise
- Noise
The hydroelectric power generation facility shall comply with the requirements of section 4.18 regarding noise.
Other
- FERC and DEQ requirements
The hydroelectric power generation facility shall comply with the requirements of the Federal Energy Regulatory Commission and the Virginia Department of Environmental Quality.
Hydroelectric power generation shall be permitted only as authorized by special use permit under section 33.5.
From the ordinance
The hydroelectric power generation facility shall be located on a lot of not less than 10 acres. The hydroelectric power generation facility shall be located not less than 100 feet from any lot line.