Albemarle County Unincorporated, Virginia · General provision
Sec. 32.6.4
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Dam break inundation zone engineering study
If the Virginia Department of Conservation and Recreation determines that a plan of development proposed by a developer would change the spillway design flood standards of an impounding structure... the developer shall submit an engineering study...
- Dam break inundation zone mapping information
The developer shall provide the dam owner, the county, and any other affected localities with information necessary for the dam owner to update the dam break inundation zone map...
From the ordinance
If the proposed development is located wholly or partially within a dam break inundation zone, the developer shall submit with the final site plan the following: a. Engineering study... b. Mapping information...