Abingdon, Virginia · General provision

Section 8-5-8(e)

Extracted standards

9 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Control peak flow rates and total volume

    Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion

  • Control stormwater volume and velocity

    Control stormwater volume and velocity within the site to minimize soil erosion

  • Minimize soil compaction and preserve topsoil

    Minimize soil compaction and, unless infeasible, preserve topsoil

  • Minimize exposed soil

    Minimize the amount of soil exposed during construction activity

  • Minimize sediment discharge

    Minimize sediment discharges from the site

  • Minimize the disturbance of steep slopes

  • Natural buffers around surface waters

    Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration, unless infeasible

  • Stabilization timing14 days

    Stabilization of disturbed areas must, at a minimum, be initiated immediately whenever any clearing, grading, excavating, or other earth disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days.

  • Surface withdrawal outlets

    Utilize outlet structures that withdraw water from the surface, unless infeasible, when discharging from basins and impoundments.

From the ordinance

Control stormwater volume and velocity within the site to minimize soil erosion; Control stormwater discharges... Minimize the amount of soil exposed... Minimize the disturbance of steep slopes; Minimize sediment discharges...
Section 8-5-8(e)