Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Post-development 10-year peak flow rate
released at a post-development peak flow rate for the ten-year, twenty-four-hour storm event that is less than the pre-development peak flow rate
- Post-development 2-year peak flow rate
released at a post-development peak flow rate for the two-year, twenty-four-hour storm event that is less than the pre-development peak flow rate
From the ordinance
Stormwater runoff from a development shall be released at a post-development peak flow rate for the two-year, twenty-four-hour storm event that is less than the pre-development peak flow rate...