Abingdon, Virginia · General provision

Section 8-5-12(a)(1)

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Post-development 10-year peak flow rate

    released at a post-development peak flow rate for the ten-year, twenty-four-hour storm event that is less than the pre-development peak flow rate

  • Post-development 2-year peak flow rate

    released at a post-development peak flow rate for the two-year, twenty-four-hour storm event that is less than the pre-development peak flow rate

From the ordinance

Stormwater runoff from a development shall be released at a post-development peak flow rate for the two-year, twenty-four-hour storm event that is less than the pre-development peak flow rate...
Section 8-5-12(a)(1)