Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Curb and gutter required if existing within 2000 feet2,000 ft
Any proposed development adjoining a public street may be required to install curb and gutter along the entire portion of the street adjoining the proposed development if existing curb and gutter exists on the same street within 2,000 feet measured from the subject property(s).
- Exemption threshold for land disturbance10,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Land-disturbing activity of less than 10,000 square feet on individual lots in a residential development shall not be considered exempt from the provisions of the VESMA if the total land-disturbing activity in the development is equal to or greater than 10,000 square feet.
- Inspection frequency during construction
Provide for an inspection during or immediately following initial installation of erosion and sediment controls, at least once in every two-week period, within 48 hours following any runoff producing storm event, and at the completion of the project prior to the release of any performance bonds
- Land disturbance permit required
Except as provided herein, no person may engage in any land-disturbing activity until a permit has been issued by the Town in accordance with the provisions of this division and the Regulation.
- Post-development peak flow for 10-year storm must be less than pre-development
and released at a post-development peak flow rate for the ten-year, twenty-four-hour storm event that is less than the pre-development peak flow rate for the ten-year, twenty-four-hour storm event.
- Post-development peak flow for 2-year storm must be less than pre-development
Stormwater runoff from a development shall be released at a post-development peak flow rate for the two-year, twenty-four-hour storm event that is less than the pre-development peak flow rate from the two-year, twenty-four-hour storm event
- Performance bond required
Prior to issuance of any permit, the applicant shall be required to submit a reasonable performance bond with surety, cash escrow, letter of credit, any combination thereof, or such other legal arrangement acceptable to the Town Attorney
From the ordinance
Stormwater runoff from a development shall be released at a post-development peak flow rate for the two-year, twenty-four-hour storm event that is less than the pre-development peak flow rate...