Brighton, Colorado · General provision

Section 10.04

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Height

Lighting

Noise

  • Noise limit

    Noise generated on the site must not exceed the levels permitted in the City of Brighton Municipal Code

Other

  • Abandonment period6 months

    Any WCF that is not operated for a continuous period of six months shall be considered abandoned.

  • Collocation required

    WCFs shall be designed and constructed to permit the facility to accommodate WCFs from at least two wireless service providers

  • Landscaping buffer required

    WCFs shall be landscaped with a buffer of plant materials that effectively screen the view of the WCF from adjacent residential properties.

From the ordinance

No person, firm or corporation shall construct, establish or build or cause to be constructed, established or built a WCF without first having obtained use-by right or conditional land use approval, a lease (as applicable), pole attachment agreement or license (as applicable), and a building permit for this purpose.
Section 10.04