Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- HeightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. restriction for OTARD antennas
the requirement that the height be no more than the distance from the base of the structure where it meets the ground to the property line
Lighting
- Artificial lighting prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance.
WCFs shall not be artificially lighted, unless required by the FAA
Noise
- Noise limit
Noise generated on the site must not exceed the levels permitted in the City of Brighton Municipal Code
Other
- Abandonment period6 months
Any WCF that is not operated for a continuous period of six months shall be considered abandoned.
- Collocation required
WCFs shall be designed and constructed to permit the facility to accommodate WCFs from at least two wireless service providers
- Landscaping buffer required
WCFs shall be landscaped with a buffer of plant materials that effectively screen the view of the WCF from adjacent residential properties.
From the ordinance
No person, firm or corporation shall construct, establish or build or cause to be constructed, established or built a WCF without first having obtained use-by right or conditional land use approval, a lease (as applicable), pole attachment agreement or license (as applicable), and a building permit for this purpose.