Dimensional standards
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Design
- Architectural compatibility of additions
Roof forms, roof pitches, exterior building materials, and exterior colors of additions shall be architecturally compatible with the primary dwelling.
Environmental
- Minimum stream setbackSetbackThe distance a building must be held back from a lot line.25 ft
No building shall be located closer than 25 feet from the top of the bank of a perennial or intermittent stream.
Floodplain
- Construct above 100-year floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions.
All proposed structures shall be constructed above the one-hundred-year floodplain.
Other
- Side yardYardThe open space left between a building and its lot line — the space a setback creates. as percentage of lot widthLot widthHow wide a lot must be, usually measured at the front setback line.10 pct
Side yard: 10% of lot width with a maximum of 10 feet
From the ordinance
Maximum site coverage 50%; front yard 20 ft; side yard 10% of lot width max 10 ft; rear yard 15 ft; height 35 ft.