Santa Catalina Island, California · General provision

22.114.180

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Signage

  • Construction sign removal period30 days

    All construction signs shall be removed from the premises within 30 days after the completion of construction, alteration or removal of the structure.

From the ordinance

All construction signs shall be removed from the premises within 30 days after the completion of construction, alteration or removal of the structure.
22.114.180