13.10.262
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Reconstruction after catastrophic event
Reconstruction of a legal nonconforming structure after a catastrophic event is allowed upon issuance of a building permit if the reconstructed structure does not increase the nonconforming dimensions and is located in substantially the same location.
- Conforming additions allowed
Conforming additions that do not increase the nonconforming dimensions of the structure are permitted upon issuance of a building permit.
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. additions prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. without varianceVariancePermission to depart from a specific dimensional rule, granted on a showing of hardship.
Nonconforming additions are not permitted unless a variance or minor exception is granted.
- Permit for reconstruction
Reconstruction of a nonconforming structure requires an administrative site development permit.
- Permit for structural alterations
Structural alterations to an existing nonconforming structure within a consecutive five-year period that do not constitute reconstruction are permitted upon issuance of a building permit.
From the ordinance
Structural alterations to an existing nonconforming structure within a consecutive five-year period that do not constitute reconstruction are permitted upon issuance of a building permit...