Sec. 34-153
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Developer installation cost
Installations for water, sewer, and storm drainage shall be installed at the expense of the developer with no rebates from the town to the developer.
- Private systems approval
Plans for use of private septic tanks, private sewer systems, or private water systems must, in such circumstances, be fully approved by all state, county, and town authorities before approval of final plat by the town commission.
- Public sewer required
Each lot within the subdivision area shall be provided with a connection to the town's public water supply and an adequate public sanitary sewer system that shall comply with the regulations of the state department of health and rehabilitative services, and standard specifications for water and sewer installation and approval of the town engineer.
- Public water required
Town water (including fire hydrants) shall be provided in each new subdivision.
From the ordinance
Town water (including fire hydrants) shall be provided in each new subdivision. Plans for use of private septic tanks, private sewer systems, or private water systems must, in such circumstances, be fully approved by all state, county, and town authorities before approval of final plat by the town commission.