Fredericksburg, Virginia · General provision

72-54.3B(11)

Dimensional standards

Servicing

Applies near
Hazel Run, Rappahannock Canal, Kenmore Flume, Deep Run
Geographic extent
Within the Hazel Run, Rappahannock Canal, Kenmore Flume, and Deep Run watersheds (the volume control area)

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Extended detention max percentage70 pct

    A one-year, twenty-four-hour extended detention may be used to satisfy up to 70% of this volume.

  • Parking lot filtration percentage50 pct

    At least 50% of the parking lot surface shall drain to a filtration practice.

  • First 0.5 inch runoff removal0.5 in

    the first one-half inch of runoff from all new impervious surfaces shall be removed from the runoff flow

From the ordinance

Within the Hazel Run, Rappahannock Canal, Kenmore Flume, and Deep Run watersheds ("the volume control area"), for new development or redevelopment, the first one-half inch of runoff from all new impervious surfaces shall be removed from the runoff flow.
72-54.3B(11)