Uses
Permitted by right1
Extracted standards
13 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Expansion must comply with all regulations
Any expansion of existing mobile home parks or mobile home developments must result in full compliance with all regulations contained in this section.
- Garbage and refuse collection2 times per week
An acceptable garbage and refuse collection program and temporary storage system shall be provided, with such program and physical system subject to final plan approval. At a minimum, the owner shall collect garbage and refuse not less than twice weekly, ensuring that collection is provided on a site-by-site, curbside basis.
- Landscaped buffer width15 ft
A landscaped buffer 15 feet in width shall be maintained around the perimeter of the mobile home park, with plant materials and placement thereof subject to final plan approval.
- Minimum rental period30 days
No space in a mobile home park shall be rented for residential use except for periods of 30 days or more.
- Mobile homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. stand and anchoring
Every mobile home site shall be provided with a mobile home stand designed to provide adequate loadbearing support. The stand shall be located as to provide for the most practical placement of the mobile home and its appurtenant structures in a manner complying with all requirements of this district. Each mobile home shall be securely anchored to each stand to prevent overturning and shifting, in accordance with National Fire Protection Association Standards, as amended from time to time.
- Mobile homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. construction standards
No mobile home shall be located in any park unless it can be demonstrated that it meets the requirements of the Mobile Home Manufacturers' Association's Mobile Home Standards for Plumbing, Heating and Electric Systems, as amended from time to time, as well as other qualifying standards adopted by the state.
- No mobile homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. site in floodplainFloodplainLand expected to flood at a stated frequency, where building carries extra conditions.
No mobile home site shall extend into a floodplain.
- Outdoor patio area200 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Every mobile home shall be provided with an outdoor patio to be adequately paved with asphalt or concrete material and located convenient to the entrance of the mobile home. The paved area shall be at least 200 square feet.
- Permanent monuments for sites
Every mobile home site as described on the site plan shall be clearly defined on the ground by permanent monuments to be located by field survey.
- Sidewalks required
Sidewalks shall be provided for safe, convenient, all-season access from mobile home stands to paved streets, parking spaces, and other concentrated pedestrian areas.
- Site plan approval required
Development within R-MH districts shall require site plan approval as set forth in Article 72-5 of this chapter.
- Access to public street
All mobile home sites shall abut a private street or driveway and have unobstructed access to a public street. Private streets and driveways shall be constructed in accordance with the standards and criteria of the Zoning Administrator.
- Street lighting
Street lighting shall be provided, with final layout and design subject to final plan approval.
From the ordinance
Development within R-MH districts shall require site plan approval as set forth in Article 72-5 of this chapter.