Fredericksburg, Virginia · General provision
Section 72-54.4 and 72-54.5
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Sanitary sewer easement width20 ft
Sanitary sewer: 20 feet
- Storm sewer easement width20 ft
Storm sewer: 20 feet
- Underground utilities required
All utilities provided by the developer shall be installed underground
- Underground utility easement width10 ft
Underground telephone, television cable, gas service or electric service: 10 feet
- Water easement width15 ft
water: 15 feet
From the ordinance
All utilities provided by the developer shall be installed underground... Minimum easement width... sanitary sewer: 20 feet and water: 15 feet...