  • Sanitary sewer easement width20 ft

    Sanitary sewer: 20 feet

  • Storm sewer easement width20 ft

    Storm sewer: 20 feet

  • Underground utilities required

    All utilities provided by the developer shall be installed underground

  • Underground utility easement width10 ft

    Underground telephone, television cable, gas service or electric service: 10 feet

  • Water easement width15 ft

    water: 15 feet

From the ordinance

All utilities provided by the developer shall be installed underground... Minimum easement width... sanitary sewer: 20 feet and water: 15 feet...