Fredericksburg, Virginia · General provision

72-54.3B(11)

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • First flush removal depth0.5 in

    the first one-half inch of runoff from all new impervious surfaces shall be removed from the runoff flow

  • Parking lot filtration (percent)50 pct

    At least 50% of the parking lot surface shall drain to a filtration practice.

  • Volume control required

    Within the Hazel Run, Rappahannock Canal, Kenmore Flume, and Deep Run watersheds ('the volume control area'), for new development or redevelopment, the first one-half inch of runoff from all new impervious surfaces shall be removed from the runoff flow.

From the ordinance

Within the Hazel Run, Rappahannock Canal, Kenmore Flume, and Deep Run watersheds ('the volume control area'), for new development or redevelopment, the first one-half inch of runoff from all new impervious surfaces shall be removed from the runoff flow.
72-54.3B(11)