Dimensional standards
Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- AccessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure in front yardYardThe open space left between a building and its lot line — the space a setback creates.
No accessory structure except a fence shall be located in any front yard.
- AccessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure side/rear setbackSetbackThe distance a building must be held back from a lot line.5 ft
No accessory use or structure shall be closer than five feet to a side or rear lot line
- Maximum accessory useAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. area25 pct
Not exceed the greater of 25% of the heated floor or buildable area of the principal use
- Maximum accessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.25 ft
No accessory structure shall exceed 25 feet in height
- Maximum accessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. in side/rear yardYardThe open space left between a building and its lot line — the space a setback creates.12 ft
or 12 feet in height if located in a side or rear yard.
- Maximum rear yardYardThe open space left between a building and its lot line — the space a setback creates. occupation30 pct
No accessory use or structure shall occupy more than 30% of the rear yard.
From the ordinance
All accessory uses and accessory structures shall meet the following standards: ... (3) Not exceed the greater of 25% of the heated floor or buildable area of the principal use...