Dimensional standards
Height & bulk
- Minimum landscaping
- 50%
Extracted standards
8 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Administrative cost allowance10 pct
An additional 10% of the total estimated cost of construction, which shall constitute a reasonable allowance for estimated administrative costs, inflation, and potential damage to existing roads or utilities
- Erosion control allowance25 pct
An additional 25% of the total estimated cost of erosion and sediment control measures associated with the land-disturbing activity
- Landscaping guarantee retention period24 months
which shall occur no earlier than 24 months after approval of the initial installation of the landscape improvements
- Landscaping guarantee retention50 pct
50% of the performance guarantee for landscaping shall be retained until final inspection and approval
- Maximum partial releases per year3 count
The developer shall be entitled to no more than three periodic partial releases within any twelve-month period.
- Maximum partial release percentage90 pct
Up to 90% of the original amount of the performance guarantee, excluding the performance guarantee for landscaping, may be released through periodic partial releases
- Partial release threshold30 pct
Upon the completion of at least 30% of the improvements covered by a performance guarantee, the applicant may file a written request for a partial release
- Termination notice period30 days
All performance guarantees shall provide that such bond, letter of credit, or other agreement shall not be terminated, canceled, or modified without at least 30 days' prior written notice by certified mail to the Development Administrator.
From the ordinance
As a condition to the approval of a final subdivision plat, site plan, grading permit or building permit, the owner or developer shall be required to guarantee completion of the public and other site-related improvements associated with the development.