Fredericksburg, Virginia · General provision

72-27.0

Dimensional standards

Height & bulk

Minimum landscaping
50%

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Administrative cost percentage10 pct

    An additional 10% of the total estimated cost of construction, which shall constitute a reasonable allowance for estimated administrative costs, inflation, and potential damage to existing roads or utilities

  • Erosion control percentage25 pct

    An additional 25% of the total estimated cost of erosion and sediment control measures associated with the land-disturbing activity

  • Landscaping guarantee retention period24 months

    50% of the performance guarantee for landscaping shall be retained until final inspection and approval, which shall occur no earlier than 24 months after approval of the initial installation of the landscape improvements.

  • Landscaping guarantee retention percentage50 pct

    50% of the performance guarantee for landscaping shall be retained until final inspection and approval, which shall occur no earlier than 24 months after approval of the initial installation of the landscape improvements.

  • Maximum partial release percentage90 pct

    Up to 90% of the original amount of the performance guarantee, excluding the performance guarantee for landscaping, may be released through periodic partial releases

From the ordinance

The required guarantee shall be provided in the following total amount: (a) The total estimated cost of construction... plus (b) An additional 10%... plus (c) An additional 25% of the total estimated cost of erosion and sediment control measures.
72-27.0