Fluvanna County Unincorporated, Virginia · General provision

Sec. 22-24-8.2

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Tree protection barrier requirements

    All areas of tree protection shall be bounded by a tree protection barrier at the perimeter of the tree protection zone. Barriers shall completely surround the tree protection area, except where the area extends more than one hundred (100) yards beyond the construction zone or routes of access to the construction zone. The tree protection areas, beyond the one hundred (100) yards, shall be flagged every one hundred feet (100') with continuous ribbon with 'Do Not Enter' signs stating prohibited activity. Barriers and flagging shall be installed prior to any land disturbing activity. Barriers shall be a minimum of five feet (5') in height, stationary, and constructed of rigid or semi-rigid materials that must be dismantled to be moved.

  • Clearing method

    Any clearing within tree protection zones shall be done by hand.

  • Tree damage repair

    Any damage done to trees within tree protection zones shall be immediately repaired.

  • Grade difference handling

    Where grade differences occur between the tree protection area and the finished grade of the adjacent areas, retaining walls and dry wells shall be used to prevent the need for grading in tree protection zones.

  • The following activities are prohibited within tree protection zones: (1) Operation of any vehicle or machinery, except as may be necessary for the installation of utility lines. (2) Parking of vehicles or equipment. (3) Storage of any materials or equipment. (4) Discharge of any substance that may be injurious to trees or understory plants.

  • Tree protection plan required

    Compliance with the tree protection program of this section is required on all site development plans involving land clearance of more than one-half of one acre (21,780 square feet of cleared land) in size, and all activities requiring a land disturbing permit except for the construction of a single or two family dwelling on an individual lot.

  • Utility routing in tree protection zones

    Wherever feasible, utilities shall be designed and routed to avoid tree protection zones. If it is necessary to route utilities through tree protection zones, the following shall apply: (1) Route utility trenches outside the drip line of trees or as far as possible from tree trunks. (2) In areas of multiple trees, where trenches must go between trees, preference should be given to stay away from larger specimen trees. (3) Equipment that is the lightest weight and makes the least possible impact shall be used to dig trenches and install utilities. (4) Rubber-tired, rather than track equipment, shall be used whenever possible. (5) Excavation materials are not to be placed against tree trunks and shall be placed as far away from trunks as possible. (6) Where excavation materials are to be placed, indicator ribbons shall be placed on undisturbed areas prior to excavation, to facilitate restoring the area to the original grade. (7) Areas where excavated materials have been placed shall be restored to the original grade with the least amount of disturbance possible.

From the ordinance

Compliance with the tree protection program of this section is required on all site development plans involving land clearance of more than one-half of one acre (21,780 square feet of cleared land) in size, and all activities requiring a land disturbing permit except for the construction of a single or two family dwelling on an individual lot.
Sec. 22-24-8.2