Farmville, Virginia · General provision

Sec. 29-34

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Tower design

    Broadcasting or communication towers shall be of a monopole design unless the town council determines that an alternative design would better blend in to the surrounding environment.

  • No facility shall be greater than one hundred ninety-nine (199) feet with a maximum of sixty (60) feet in B-2 and R-3 zoning districts.

  • Tower removal

    All towers and associated facilities shall be removed within six (6) months of the cessation of operations at the site unless a time extension is approved by the zoning administrator.

  • Towers shall have a minimum front, side, and rear yard setback equal to the height of the tower.

  • Underground utilities

    All on-site utilities or utility facilities shall be installed underground, including electrical, water, sewer, power, gas, telephone, and cable utilities, except for transmission powerlines of 34,500 volts or greater, water towers, or other installations approved by the town council.

From the ordinance

Except for transmission powerlines of thirty-four thousand five hundred (34,500) volts or greater, water towers, or other installations approved by the town council, all on-site utilities or utility facilities shall be installed underground.
Sec. 29-34