Farmville, Virginia · General provision

Sec. 29-13(b)

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Zoning permit required

    a zoning permit, obtained from the zoning administrator, is required before any building or structure in the town shall be started, reconstructed, enlarged, or altered.

From the ordinance

a zoning permit, obtained from the zoning administrator, is required before any building or structure in the town shall be started, reconstructed, enlarged, or altered.
Sec. 29-13(b)