Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Certificate of occupancy issuance timeline
The certificate shall be issued within 10 days after the erected building or structural alteration of such building or part has conformed with the provisions of this chapter, the Uniform Statewide Building Code and other pertinent state regulations.
- Certificate of occupancy required
Land may be used or occupied and buildings which have been structurally altered or erected may be used or changed in use only after a certificate of occupancy has been issued by the Administrator.
- Drawing required with permit application
Each application for a zoning permit shall be accompanied by three copies of an adequately dimensioned drawing... showing size and shape of parcel, nature of proposed use, location of off-street parking, location relative to property lines and right-of-way, and drainage plan.
- Fees required
Until all application fees, charges and expenses have been paid in full, no action shall be taken on any application or appeal.
Where uses are permitted by special use permit, the location and beginning of such uses shall require, in addition to the zoning permit and certificate of occupancy, a special use permit.
- Zoning permit required
No buildings or structures shall be started, repaired, reconstructed, enlarged or altered or use begun until after a zoning permit has been obtained from the Administrator.
From the ordinance
No buildings or structures shall be started, repaired, reconstructed, enlarged or altered or use begun until after a zoning permit has been obtained from the Administrator.