Extracted standards
14 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Temporary sign attachment
temporary on-premises signs shall be securely attached to a building or building appendage or securely attached to posts, stakes, or other supports
- Banner minimum heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.7 ft
Banners shall be erected at a minimum of seven feet above grade, except where flush-mounted against the face of a building.
- Temporary sign count per lot frontageFrontageThe length of a lot line that touches a public street.1 count
Only one temporary sign per lot frontage shall be erected or posted at any given time on any lot
- Temporary cover duration for change of ownership60 days
A temporary cover placed over an existing sign face because of change of ownership or the name of the business establishment shall be considered a temporary sign and shall be subject to the regulations of this section, except that such sign shall be permitted for a period of up to 60 calendar days.
- Temporary cover extension30 days
the zoning administrator may extend the time period for the zoning permit up to 30 calendar days
- Temporary sign maximum duration30 days
no temporary sign shall be erected or placed for a period exceeding 30 calendar days.
- Inflatable sign count per lot1 count
Only one such sign per lot shall be permitted at any one time
- Inflatable sign duration15 days
Inflatable signs shall be permitted only in conjunction with the opening of a new business in a business district and shall be permitted only for a period of not more than 15 days after the opening of such new business.
- Inflatable sign setbackSetbackThe distance a building must be held back from a lot line. from lot line8 ft
Inflatable signs shall be securely fastened to the ground or other immovable object and shall be located a minimum of eight feet from the lot line.
- Temporary sign no illumination
A temporary sign shall not be illuminated.
- Temporary signs not counted in sign area
Temporary signs shall not be included in the computation of permitted sign area
- Pennants and streamers duration15 days
Pennants and streamers, without advertising, may be displayed simultaneously with a temporary grand opening sign, but at no other time, provided such pennants and streamers shall be permitted only in conjunction with the opening of a new business in a business district and shall be permitted only for a period of not more than 15 days after the opening of such new business.
- Temporary sign permit limit per year4 count
Zoning permits for temporary signs shall be limited to four such permits per 365-day period per establishment
- Temporary sign permit required
No temporary sign shall be erected or posted until a zoning permit has been issued
From the ordinance
No temporary sign shall be erected or posted until a zoning permit has been issued