Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum duration of yardYardThe open space left between a building and its lot line — the space a setback creates. sale3 days
Yard sales conducted under this section shall be limited in time to no more than three consecutive days per sale
- Maximum frequency of yardYardThe open space left between a building and its lot line — the space a setback creates. sales per year4 times/year
may not be conducted more than four times per calendar year
- ProhibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. during Pony Penning
are not permitted from and including the Saturday preceding Pony Penning through the Saturday following Pony Penning.
From the ordinance
Yard sales conducted under this section shall be limited in time to no more than three consecutive days per sale and may not be conducted more than four times per calendar year and are not permitted from and including the Saturday preceding Pony Penning through the Saturday following Pony Penning. Any sale exceeding this time period or otherwise not in compliance with this section will not be considered a yard sale and will be in violation of this section and will be considered a business and must comply with all applicable zoning and business licensing requirements.