Chesterfield County Unincorporated, Virginia · General provision

19.2-37 D.2.i

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Setback

From the ordinance

The required setback for a principal structure shall be the greater of 20 feet from the temporary turnaround easement, or the required yard setback measured from the ultimate right-of-way or property line, as applicable.
19.2-37 D.2.i